About Air Science & Engineering
Customer Testimonials
Facility Manager
"Very satisfied with the design recommendations and the overall quality of the services you provided."
Facilities Engineer
"I was impressed by how fast Air Science & Engineering was able to get up to speed on the issues at our plant."
Building Owner
"Very happy that Air Science & Engineering was involved with this project! Very professional approach."
Senior Process Engineer
"With the ventilation modifications installed, there is less temperature variation in the batch; this is what we were looking for."
Consulting Engineer
"When we need CFD again, you'll be the first people we call!"
Industrial Hygienist
"Now that the recommended ventilation modifications have been installed, there is no longer a chemical odor in the processing area; everything seems fine, tests results showed none detected."
Mechanical Contractor
"The new system has been running for a year, so far seems great!"
Project Manager
"For the next project, we will definitely be coming back to Air Science & Engineering!"
Building Contractor
"The reports were excellent; a very nice job on your part."
Director - Engineering
"Excellent presentation of the project results."
Corporate Engineer
"Project with Air Science & Engineering has been very successful."
Project Manager
"The exhaust for the new equipment is working well; thanks for your many great inputs."
Manager - Engineering
"The results look great; thanks for the rapid turnaround!"
Mechanical Contractor
"The recommended temporary changes worked very well to get us through the construction phase."
Facilities Engineer
"I like the concept of what was proposed; it was different from what we were thinking, and makes sense."
Business Unit Manager
"After seeing the images from the model, I can finally see what the safety people have been talking about regarding this contaminant exposure issue."
Mechanical Contractor
"Pretty impressive, I thought there might be a poor air distribution problem in that area."
Maintenance Manager
"With the new exhaust hood design, we're saving thousands of dollars per year per machine just in reduced maintenance, but the biggest savings is in reduced production downtime."
EHS Manager
"The model results were so convincing that our next step was a no brainer!"
Facility Manager
"Once the recommended changes were installed, complaints from the solvent fumes stopped."
Process Engineer
"The new hood works just like the model predicted it would!"